Kitchens
House-Apartment

We begin with a clear plan, confirming layouts, selections, and timelines so you know what to expect at every stage (typically 1–5 days, depending on project size and material complexity).
Demolition of existing cabinets, benchtops, and fixtures is carried out carefully to protect your home and minimise disruption (usually 1–3 days).
Walls, floors, and openings are prepared for the new design, including any minor structural adjustments or relocations (around 1–3 days).
Licensed plumbers and electricians complete the services rough-in, installing pipes, power points, and connections in readiness for the next stage (typically 1–2 days, depending on complexity).
Custom joinery and cabinets are fabricated and installed, bringing your kitchen design to life piece by piece. Cabinet fabrication usually takes 2–4 weeks and is ordered at the planning and design confirmation stage, with installation completed in 2–3 days.
Fixtures, fittings, and appliances — including sinks, taps, handles, and hardware — are carefully fitted and tested to ensure everything works perfectly (1–2 days).
Stone benchtops, tile splashbacks, and final surface finishes are installed, adding on trend style and functionality to your kitchen (2–4 days).
Finally, we walk you through your new kitchen, checking every detail and ensuring you feel confident in how it works leaving you ready to enjoy your space, often within just 2 weeks after installation begins.






